FMCG & Food Production
For bottlers, packagers, and cold-chain to retail.
Bottling lines in Sandton, dairy in Eldoret, edible-oil refineries in Lagos, bakeries in Cairo. FMCG runs 24/7 on packaging lines whose OEE is measured in tenths of a percent, governed by HACCP frequencies that demand documented sanitation, and exposed to a cold-chain that ends at a kiosk fridge in Soweto. Comiine ships with the templates and audit trails for all of it.
The pains we hear in every demo.
24/7 production lines have no maintenance window
Bottling lines that planned-stop once a week have lost the luxury of weekly PM. Maintenance must happen in 11-minute changeover gaps.
HACCP sanitation frequencies are auditable, not advisory
A CIP cycle missed on a fill line is a regulatory finding. Paper-based sanitation logs do not survive a FSSC 22000 audit.
Cold-chain handoff to last-mile is opaque
A reefer leaves the depot at -18°C and arrives at the retail DC at -12°C. Whose fault, whose loss, whose insurance? Most CMMS have no answer.
Built for your reality, not a slide.
High-frequency meter-based PM on packaging lines
Triggers on hours-of-operation, fill-cycle count, or label-applicator count. PM happens when the line earns it, not when the calendar says.
HACCP and FSSC 22000 audit packs built-in
CIP cycles, allergen changeovers, sanitation sign-offs — all timestamped, photo-verified, exportable as the FSSC clause structure the auditor wants.
Cold-chain deviations become records, not arguments
Temperature readings log against the reefer asset with timestamps and technician attribution. When a load arrives out of spec, the maintenance history answers the question.
What disciplined maintenance is worth.
Recognise these?
Sample asset codes from our demo estate. Yours will look familiar.
What changes on Monday morning.
A production maintenance lead at a Sandton bottler sees BTL-FLR-12 dropped to Degraded at 14:22. The cause: a torque-arm vibration meter exceeded threshold. The WO is already drafted, the standby fitter assigned. She approves with one tap. The line is back to Operational by 14:46 — a 24-minute incident that would have been a 90-minute one with paper.
Built audit-ready.
See Comiine on your fmcg & food production asset surface.
30 minutes. Live data. No slide deck.
Book a demo